Files
ui/_docs/_autodev_state.md
T
Oleksandr Bezdieniezhnykh 2071a24391
ci/woodpecker/push/build-arm Pipeline was successful
[AZ-485] [AZ-486] Phase B Step 9: F4 barrels + F7 endpoints task specs
Closes Step 9 New Task cycle 1. Two refactor tasks created under epic
AZ-447 to address architecture compliance baseline findings:

- AZ-485 (5 pts) — F4 Public API barrels per component + STC-ARCH-01
- AZ-486 (5 pts) — F7 endpoint builders (endpoints.ts) + STC-ARCH-02
  (depends on AZ-485; Jira "Blocks" link set)

F1 (mission-planner duplication) deliberately deferred. Baseline routes
it through 7+ Phase B port-group cycles requiring decompose pass into
its own Epic; out of scope for new-task.

_autodev_state.md advances to Step 10 (Implement), awaiting invocation
for AZ-485 first.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-05-11 10:14:12 +03:00

37 lines
1.7 KiB
Markdown

# Autodev State
## Current Step
flow: existing-code
step: 10
name: Implement
status: not_started
sub_step:
phase: 0
name: awaiting-invocation
detail: "Step 9 closed; AZ-485 (F4 barrels) + AZ-486 (F7 endpoints) ready in todo/; AZ-485 first (AZ-486 depends on barrel)"
retry_count: 0
cycle: 1
tracker: jira
step_4_5_glossary_vision: confirmed
step_2_baseline_routing: per-finding-recommended (option A)
step_3_results_report_authoring: agent (option A)
step_3_ac_gap_handling: rollback-to-6c (option A)
## Notes
- Phase A baseline cycle. Step 1 (Document) complete; see
`_docs/02_document/state.json`, `FINAL_report.md`, `architecture.md`,
`glossary.md`, plus `_docs/01_solution/solution.md` and
`_docs/00_problem/{problem,acceptance_criteria,restrictions,security_approach}.md`.
- Implement-skill batch reports at
`_docs/03_implementation/batch_0{1..8}_report.md`.
- Cumulative reviews PASS_WITH_WARNINGS at
`_docs/03_implementation/cumulative_review_batches_01-03_report.md`,
`_docs/03_implementation/cumulative_review_batches_04-06_cycle1_report.md`,
`_docs/03_implementation/cumulative_review_batches_07-08_cycle1_report.md`
(cycle close — Phase A wrap, no batch 9).
- Phase B started. Step 9 (New Task) cycle 1 closed:
- AZ-485 (F4 — Public API barrels + STC-ARCH-01, 5 pts, no deps)
- AZ-486 (F7 — Endpoint builders + STC-ARCH-02, 5 pts, blocked by AZ-485)
- F1 (mission-planner convergence) deliberately not created — needs `/decompose` for 7+ port-group cycles in its own Epic.
- Step 10 (Implement) starts with AZ-485 — `Blackbox Tests` owns the static-check addition and the `tests/**` import-path migration; production component teams own their barrel files per `module-layout.md`.