Closes Step 9 New Task cycle 1. Two refactor tasks created under epic AZ-447 to address architecture compliance baseline findings: - AZ-485 (5 pts) — F4 Public API barrels per component + STC-ARCH-01 - AZ-486 (5 pts) — F7 endpoint builders (endpoints.ts) + STC-ARCH-02 (depends on AZ-485; Jira "Blocks" link set) F1 (mission-planner duplication) deliberately deferred. Baseline routes it through 7+ Phase B port-group cycles requiring decompose pass into its own Epic; out of scope for new-task. _autodev_state.md advances to Step 10 (Implement), awaiting invocation for AZ-485 first. Co-authored-by: Cursor <cursoragent@cursor.com>
37 lines
1.7 KiB
Markdown
37 lines
1.7 KiB
Markdown
# Autodev State
|
|
|
|
## Current Step
|
|
flow: existing-code
|
|
step: 10
|
|
name: Implement
|
|
status: not_started
|
|
sub_step:
|
|
phase: 0
|
|
name: awaiting-invocation
|
|
detail: "Step 9 closed; AZ-485 (F4 barrels) + AZ-486 (F7 endpoints) ready in todo/; AZ-485 first (AZ-486 depends on barrel)"
|
|
retry_count: 0
|
|
cycle: 1
|
|
tracker: jira
|
|
step_4_5_glossary_vision: confirmed
|
|
step_2_baseline_routing: per-finding-recommended (option A)
|
|
step_3_results_report_authoring: agent (option A)
|
|
step_3_ac_gap_handling: rollback-to-6c (option A)
|
|
|
|
## Notes
|
|
- Phase A baseline cycle. Step 1 (Document) complete; see
|
|
`_docs/02_document/state.json`, `FINAL_report.md`, `architecture.md`,
|
|
`glossary.md`, plus `_docs/01_solution/solution.md` and
|
|
`_docs/00_problem/{problem,acceptance_criteria,restrictions,security_approach}.md`.
|
|
- Implement-skill batch reports at
|
|
`_docs/03_implementation/batch_0{1..8}_report.md`.
|
|
- Cumulative reviews PASS_WITH_WARNINGS at
|
|
`_docs/03_implementation/cumulative_review_batches_01-03_report.md`,
|
|
`_docs/03_implementation/cumulative_review_batches_04-06_cycle1_report.md`,
|
|
`_docs/03_implementation/cumulative_review_batches_07-08_cycle1_report.md`
|
|
(cycle close — Phase A wrap, no batch 9).
|
|
- Phase B started. Step 9 (New Task) cycle 1 closed:
|
|
- AZ-485 (F4 — Public API barrels + STC-ARCH-01, 5 pts, no deps)
|
|
- AZ-486 (F7 — Endpoint builders + STC-ARCH-02, 5 pts, blocked by AZ-485)
|
|
- F1 (mission-planner convergence) deliberately not created — needs `/decompose` for 7+ port-group cycles in its own Epic.
|
|
- Step 10 (Implement) starts with AZ-485 — `Blackbox Tests` owns the static-check addition and the `tests/**` import-path migration; production component teams own their barrel files per `module-layout.md`.
|