mirror of
https://github.com/azaion/ui.git
synced 2026-06-21 09:21:10 +00:00
2071a24391
ci/woodpecker/push/build-arm Pipeline was successful
Closes Step 9 New Task cycle 1. Two refactor tasks created under epic AZ-447 to address architecture compliance baseline findings: - AZ-485 (5 pts) — F4 Public API barrels per component + STC-ARCH-01 - AZ-486 (5 pts) — F7 endpoint builders (endpoints.ts) + STC-ARCH-02 (depends on AZ-485; Jira "Blocks" link set) F1 (mission-planner duplication) deliberately deferred. Baseline routes it through 7+ Phase B port-group cycles requiring decompose pass into its own Epic; out of scope for new-task. _autodev_state.md advances to Step 10 (Implement), awaiting invocation for AZ-485 first. Co-authored-by: Cursor <cursoragent@cursor.com>
1.7 KiB
1.7 KiB
Autodev State
Current Step
flow: existing-code step: 10 name: Implement status: not_started sub_step: phase: 0 name: awaiting-invocation detail: "Step 9 closed; AZ-485 (F4 barrels) + AZ-486 (F7 endpoints) ready in todo/; AZ-485 first (AZ-486 depends on barrel)" retry_count: 0 cycle: 1 tracker: jira step_4_5_glossary_vision: confirmed step_2_baseline_routing: per-finding-recommended (option A) step_3_results_report_authoring: agent (option A) step_3_ac_gap_handling: rollback-to-6c (option A)
Notes
- Phase A baseline cycle. Step 1 (Document) complete; see
_docs/02_document/state.json,FINAL_report.md,architecture.md,glossary.md, plus_docs/01_solution/solution.mdand_docs/00_problem/{problem,acceptance_criteria,restrictions,security_approach}.md. - Implement-skill batch reports at
_docs/03_implementation/batch_0{1..8}_report.md. - Cumulative reviews PASS_WITH_WARNINGS at
_docs/03_implementation/cumulative_review_batches_01-03_report.md,_docs/03_implementation/cumulative_review_batches_04-06_cycle1_report.md,_docs/03_implementation/cumulative_review_batches_07-08_cycle1_report.md(cycle close — Phase A wrap, no batch 9). - Phase B started. Step 9 (New Task) cycle 1 closed:
- AZ-485 (F4 — Public API barrels + STC-ARCH-01, 5 pts, no deps)
- AZ-486 (F7 — Endpoint builders + STC-ARCH-02, 5 pts, blocked by AZ-485)
- F1 (mission-planner convergence) deliberately not created — needs
/decomposefor 7+ port-group cycles in its own Epic.
- Step 10 (Implement) starts with AZ-485 —
Blackbox Testsowns the static-check addition and thetests/**import-path migration; production component teams own their barrel files permodule-layout.md.