Commit Graph

6 Commits

Author SHA1 Message Date
Oleksandr Bezdieniezhnykh be5c6d20aa [AZ-589] [AZ-590] Close completeness gate cycle 1: VIO remediation tasks
The Product Implementation Completeness Gate (cycle 1, 2026-05-16)
audited 107 done product tasks. 105 PASS / 0 BLOCKED / 2 FAIL.

FAIL findings — both AZ-332 (OKVIS2) and AZ-333 (VINS-Mono) ship a
real Python facade + AC-tested fake backend, but their native pybind11
bindings (_native/okvis2_binding.cpp, _native/vins_mono_binding.cpp)
are skeletons: _build_estimator() sets estimator_built_ = false; the
first add_frame() raises *FatalException("estimator not yet wired").
Production-default VIO and the comparative-study path both crash on
the first nav-camera frame.

Remediation tasks created in _docs/02_tasks/todo/:
  - AZ-589  remediate_okvis2_threadedkfvio_wiring  (5pt)
  - AZ-590  remediate_vins_mono_estimator_wiring   (5pt)

Both tasks also seed the per-binary bootstrap register_strategy() call
sites — the existing strategy registry in runtime_root/__init__.py is
never invoked in src/ today.

Artifacts:
  - _docs/03_implementation/implementation_completeness_cycle1_report.md
  - _docs/02_tasks/todo/AZ-589_remediate_okvis2_threadedkfvio_wiring.md
  - _docs/02_tasks/todo/AZ-590_remediate_vins_mono_estimator_wiring.md
  - _docs/02_tasks/_dependencies_table.md  (+2 rows; totals refreshed)
  - _docs/_autodev_state.md                (Step 7 phase 1 parse;
                                            current_batch: 66)

Returning to implement-skill Step 1 to parse Batch 66 against these
remediation tasks (per Step 15 option A).

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-05-16 10:24:38 +03:00
Oleksandr Bezdieniezhnykh 8382cdae10 start over again 2026-05-07 04:08:03 +03:00
Oleksandr Bezdieniezhnykh 2425f8e6fd [AZ-243] Integrate production native VIO runtime
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-05-07 00:04:46 +03:00
Oleksandr Bezdieniezhnykh 3d2c22d8ba [AZ-243] Update autodev state and dependencies table
- Changed the autodev state to reflect the new phase and task name for remediation related to AZ-243.
- Updated the dependencies table to include the new task AZ-243 and adjusted dependencies for AZ-233.
- Added a section in the implementation completeness report to document the creation of the AZ-243 remediation task aimed at integrating the production native VIO runtime.
2026-05-06 23:57:09 +03:00
Oleksandr Bezdieniezhnykh cab7b5d020 [AZ-233] Update Docker Compose and enhance test documentation
- Modified the Docker Compose configuration to include an input root for replay tests and added an environment variable for enabling SITL.
- Enhanced documentation for various testing processes, including the addition of a Runtime Completeness Decomposition Gate and clarifications on internal module testing requirements.
- Updated the implementation completeness report to reflect the current state and added new test cases for performance and resilience scenarios.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-05-06 05:03:48 +03:00
Oleksandr Bezdieniezhnykh 70f786f2d1 [AZ-240] [AZ-241] [AZ-242] Add native retrieval remediation
Implement the product remediation paths required before greenfield
code testability revision: native VIO backend selection, local
VPR descriptor index retrieval, and computed anchor matching gates.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-05-05 06:05:10 +03:00