mirror of
https://github.com/azaion/gps-denied-onboard.git
synced 2026-06-21 08:41:12 +00:00
10c2a1ed2e
AZ-842 work was shipped 2026-05-29 in commit 42b1db6 (spec in
done/, Invariant 14 + cycle-4 redesign narrative landed in
replay_protocol.md, architecture.md, tests/e2e/replay/README.md)
but the Jira ticket was never transitioned out of To Do.
Discovered when batch-planning surfaced AZ-842 as a candidate;
my own eighth-bump dep-table narrative incorrectly listed AZ-842
in "cycle-4 todo/ remainder" alongside AZ-899/900/901.
Fixed by:
- Jira: AZ-842 To Do -> In Progress -> Done, read-back verified.
- dep-table preamble: ninth bump documents the drift discovery
and corrects the cycle-4 todo/ remainder to AZ-899 + AZ-900 +
AZ-901 = 3 SP (was incorrectly stated as 6 SP).
- state.md: batch 8 records the tracker-only fix.
No code changes — the work itself was already on disk.
Co-authored-by: Cursor <cursoragent@cursor.com>
712 B
712 B
Autodev State
Current Step
flow: existing-code step: 10 name: Implement status: in_progress sub_step: phase: 6 name: implement-tasks detail: "batch 8 = tracker-only fix for AZ-842 drift (work already shipped 2026-05-29 in commit 42b1db6; Jira ticket was stuck in To Do; transitioned To Do → In Progress → Done with read-back verified). Corrected cycle-4 todo/ remainder: AZ-899 (1) + AZ-900 (1) + AZ-901 (1) = 3 SP product (down from 6 — AZ-842 erroneously listed by my earlier eighth-bump preamble narrative). OKVIS2 chain (AZ-943 + AZ-951 + AZ-952) sits in todo/ but is sequenced after the Derkachi e2e flight test passes per user 2026-05-29 directive." retry_count: 0 cycle: 4 tracker: jira